Injection molding
In injection molding production, when products show burnt marks, bubbles, or short shots at the end of fill, many problems ultimately point to the same cause—air trapping in the mold. Air trapping itself is invisible, but its "symptoms" leave traces on both the product and the mold. Recently, several frontline injection molding engineers summarized a troubleshooting method that runs from symptom identification to root cause confirmation, offering an actionable path to solving this common problem.
First, Look at the Symptoms: Defect Locations Are the Clues
Air trapping most commonly manifests on the molded part. Burnt marks or scorch marks often appear at dead corners where gas accumulates, at the front of ribs, or at the end of flow, appearing yellow or black—a typical signal of plastic degradation caused by high temperatures after the gas is compressed. Bubbles are commonly seen in thick-walled areas or at the end of flow and must be distinguished from shrinkage voids—air-trap bubbles change little in size when holding pressure is adjusted, while vacuum voids are more sensitive to holding pressure. In addition, short shots (incomplete filling) and silver streaks or surface gas marks are also common signs of air trapping. Engineers note that if a defect repeatedly appears in the same location, that spot can basically be judged as a fixed air-trap point.
Short-Shot Testing: See Where the Melt Fills Last
The most practical on-site method for locating air trapping is short-shot testing. The approach is to gradually reduce the injection volume so that the melt fills only to a certain stage of the cavity, and observe the area the melt front reaches last. Those locations that the melt fills last, or that can only be reached by flowing around a certain structure, are where gas is most easily trapped. If short-shot testing reveals that the front of a certain rib or boss is always short of material, it indicates poor venting there, and air trapping is inevitable in mass production.
Check Whether Venting Channels Are Clear
Directly inspect the mold's vent grooves, ejector pin clearances, and insert mating surfaces at the locations corresponding to the defects for blockage, oil contamination, or insufficient depth. Vent grooves are typically only 0.02–0.05 mm deep and are easily blocked by residue. Engineers specifically caution that if air trapping appears only after the mold has been in use for some time, vent blockage is more likely than a design problem.
Mold Flow Analysis for Early Prediction
If the mold is still in the design stage, or if you want to systematically check for potential air-trap points, you can run a filling simulation with mold flow analysis software, which will directly flag "Air Trap" results, showing the risk of gas accumulation at melt convergence points or the last-filled locations. For molds with complex structures and many ribs, this is the most valuable inspection method before mold opening.
Speed-Reduction Trial as Auxiliary Confirmation
If air trapping is suspected at a certain location, you can temporarily reduce injection speed and run a few trial shots. With lower injection speed, gas has more time to escape through the vent grooves. If burnt marks or bubbles are noticeably reduced, it can basically be confirmed that the air trapping is caused by insufficient venting capacity rather than material drying or other issues. However, engineers emphasize that speed reduction is only a verification method, not a long-term solution—the real fix must start with venting design or process optimization.
Industry experts say the key to air-trap troubleshooting lies in combining "reading product defects" with "checking mold venting" to form a closed-loop judgment from phenomenon to root cause, rather than blindly adjusting process parameters whenever burnt marks appear. This five-step troubleshooting method provides injection molding enterprises with a practical on-site diagnostic guide.





